[ Compare ]

You are not choosing
between two tools.
You are choosing whether
the seam stays manual.

The honest comparison is not ArosBid against your takeoff software. It is ArosBid against how a pursuit runs on your desk today — the inbox, the share drive, and the spreadsheet built in the last hour before close.

Stage by stage.

Seven stages of a pursuit, as they run now and as they run with the gate in place.

  1. 01Intake
    How it runs now

    An invitation lands in somebody’s mailbox. Whoever opens it first decides, informally, whether it is worth chasing.

    With ArosBid

    The invitation is recognised, a pursuit workspace opens, and the close calendar is drafted against the real dates in the documents.

  2. 02Reading the set
    How it runs now

    Whoever has hours available skims the sections they always skim. The front end is read last, if at all.

    With ArosBid

    Every document and every addendum is read, including the front end, and each finding is cited to the document and page that proves it.

  3. 03Bid / no-bid
    How it runs now

    A hallway conversation, decided on memory of how this general contractor behaved last time.

    With ArosBid

    Scored against your own record with that GC and against comparable pursuits you have already closed.

  4. 04Vendor solicitation
    How it runs now

    RFQ packages assembled by hand and sent by hand. Follow-ups happen when somebody remembers.

    With ArosBid

    Packages drafted per trade, and every open quote tracked with follow-ups until it lands or the trade is covered.

  5. 05Leveling
    How it runs now

    A spreadsheet built in the last hour before close. Vendor totals are trusted as printed and exclusions live in the fine print.

    With ArosBid

    Every quote normalised to the same scope lines, each stated total reconciled against its own itemisation, exclusions pulled out and priced.

  6. 06Proposal
    How it runs now

    Scope, clarifications and exclusions written from memory and from whatever the last similar job said.

    With ArosBid

    Assembled from the decisions actually recorded during this pursuit, so what you send matches what you priced.

  7. 07After submission
    How it runs now

    The folder closes. Why the bid was lost is rarely written down, so the next pursuit starts from the same blank page.

    With ArosBid

    Buyout, bonds, turnover and debrief run in the same workspace, and the bid-to-win gap feeds the next number.

Where everyone actually sits.

The category is not one queue. Most tools solve a different stage of preconstruction, and knowing which stage is the whole buying decision.

Preconstruction software categories, named examples, and what each is built for.
StageCategoryExamplesBuilt for
QuantitiesAI quantity takeoffTogal.AI, Drawer AIReading drawings to detect, measure, count and label elements automatically, returning structured quantities without manual measurement.
CostPreconstruction estimatingEdiphi, QuotrCentralising cost management and estimating — cost modelling, value engineering and detailed estimates from early design onward.
RiskContract and document AIContraVaultReviewing contracts and project documents for risk, alongside takeoff and project-management tooling.
ScheduleSchedule optimisationALICE TechnologiesGenerating and comparing construction schedule options against constraints and resourcing.
IntakeBid sourcingBuildingConnected, ConstructConnect, SmartBidDistributing and aggregating invitations to bid between general contractors and subcontractors.
The seamRunning the pursuitArosBidReading the whole set including the front end, drafting every send, reconciling every total as code, and stopping at a human before anything leaves the office.

Why we would back ourselves.

Five claims, each of which you can check on a walkthrough rather than take on faith.

  1. 01
    We read the front end

    Most of the category starts at the drawings. The clauses that disqualify a bid — mandatory attendance, prequalification, bonding thresholds — live in Division 00 and 01, and we read those first.

  2. 02
    We do not price by model

    Every extension, sum, reconciliation and allowance is deterministic integer-cent code. A takeoff that is five percent light is checkable; a hallucinated total is not.

  3. 03
    The gate is architecture

    The mail connector cannot release anything that does not cite a recorded, approved decision. It is not a confirmation dialog the agent could route around.

  4. 04
    We run the whole cycle, not one stage

    Intake, review, bid/no-bid, BOM, RFQs, leveling, budget, proposal, readiness, then buyout and debrief. The seam between stages is where bids are lost.

  5. 05
    Your stack is untouched

    We do not measure quantities and do not want to. Takeoff, cost data and accounting stay exactly where they are, which is why we integrate with them rather than replace them.

Why choose us.

Four things that are architecture rather than features, which is why no plan removes them.

Built by Arosplatforms

We build AI operating systems that run your whole business.

ArosBid is the construction vertical of Arosplatforms, an AI consulting firm that builds industry-specific AI operating systems and ships them end to end — strategy, custom development, agents and automation, retrieval systems, MLOps, and governance.

arosplatforms.com
  • 12industry AI operating systems, of which preconstruction is one
  • 40+clients served across those industries
  • 3 weeksto first value, as published by Arosplatforms
  • AI strategy & advisory
  • Custom AI development
  • Agents & automation
  • RAG & knowledge systems
  • MLOps & infrastructure
  • Governance & security

Figures as published by Arosplatforms.

See both columns on your own pursuit.

Book a live demo