[ Mechanical ]
Equipment carries both the number and the lead time. A schedule that disagrees with its specification, a startup line excluded in the fine print, or a controls scope nobody claimed will each surface at buyout instead of on bid day.
Every document that governs a mechanical bid, and the ones that hide something.
9 documents in this mechanical package. 5 of them carry something that changes the number, and only one of those is a drawing.
One extract from the mechanical documents, at the scale an estimator reads it.
| Mark | Service | Capacity | Stated by |
|---|---|---|---|
| CH-1 | Chilled water | 350 TON | Spec 23 64 00 |
| CH-1 | Chilled water | 400 TON | Drawing M-401Does not agree |
| AHU-1 | Supply air | 24,000 CFM | Agrees |
| P-1 | Condenser water | 1,200 GPM | Agrees |

Each one cited to the document and page that proves it, so an estimator can verify it, price it, and approve the move.
The chiller schedule and the specification state different capacities. Priced either way, one of them is wrong, and the RFI has to go out before the number is set.
SCOPE GAPFactory startup labor and test-and-balance sit outside the quoted price and inside the spec’s expectation. The gap is labor you already owe.
ADDED LABORIntegration to the building automation system reads as another trade’s scope in both sections. Two bidders exclude it and it lands on yours.
SPLIT SCOPEA one-year manufacturer warranty offered against a two-year requirement, extendable at a price that never appears on the quote.
WARRANTY GAPIllustrative of the conditions this trade bids. Named pursuits, companies, and prices across this site are fictional.
The same trade prices very differently depending on what is being built.
HealthcareAir change rates, pressure relationships, and phased shutdowns written into the spec rather than the drawings.
Data centersRedundancy language, CRAH counts, and the concurrent-maintainability clause that changes the equipment list.
EducationSummer shutdown windows and liquidated damages tied to the first day of term.
IndustrialProcess cooling loads carried in an appendix the invitation email never mentions.
Commercial officeTenant fit-out alternates priced separately and awarded together.Mechanical leveling turns on what the equipment quote excludes. ArosBid normalizes every vendor package to the same scope line, reconciles the stated total against its own itemization, and drafts the RFI when the two disagree.