Mechanical estimating software. Takeoff, estimate, and the bid after.

Chillers, air handlers, and the controls boundary. Three places a mechanical bid quietly loses its margin.

Specification
Division 23
Sheets
M-series
Gate
You press send

Equipment carries both the number and the lead time. A schedule that disagrees with its specification, a startup line excluded in the fine print, or a controls scope nobody claimed will each surface at buyout instead of on bid day.

The whole package, opened out.

Every document that governs a mechanical bid, and the ones that hide something.

  1. 00 21 13Instructions to bidders
  2. 01 11 00Summary of workMandatory site visit
  3. 23 05 00Common HVAC requirementsWarranty term
  4. 23 09 00Instrumentation and controlControls boundary
  5. 23 64 00Packaged water chillersCapacity conflict
  6. M-101Floor plans
  7. M-401Equipment schedulesCapacity conflict
  8. M-501Details
  9. ADD-03Addendum 3

9 documents in this mechanical package. 5 of them carry something that changes the number, and only one of those is a drawing.

Read the document, not the summary.

One extract from the mechanical documents, at the scale an estimator reads it.

Equipment schedule · extractM-401 / 23 64 00
Equipment schedule extract. Chiller CH-1 is listed at two different capacities by two different documents.
MarkServiceCapacityStated by
CH-1Chilled water350 TONSpec 23 64 00
CH-1Chilled water400 TONDrawing M-401Does not agree
AHU-1Supply air24,000 CFMAgrees
P-1Condenser water1,200 GPMAgrees
50 tons apart, one mark.Equipment cost, electrical service, structural support, and lead time all move with it. RFI drafted before the number is set.
Division 23 · M-series

What it catches in mechanical.

Each one cited to the document and page that proves it, so an estimator can verify it, price it, and approve the move.

Illustrative of the conditions this trade bids. Named pursuits, companies, and prices across this site are fictional.

Sector changes the clauses.

The same trade prices very differently depending on what is being built.

How ArosBid runs it.

Mechanical leveling turns on what the equipment quote excludes. ArosBid normalizes every vendor package to the same scope line, reconciles the stated total against its own itemization, and drafts the RFI when the two disagree.

ArosBid includes takeoff and estimate and replaces Trimble AutoBid. Then it runs the bid process after those quantities exist.

Vendor packages go out from construction vendor RFQ. Quotes come back to vendor quote leveling. Later changes sit on the construction bid addendum log. MEP estimating as a hub is MEP estimating software. Mechanical estimating as its own search is mechanical estimating software.

Alongside
  • Bluebeam Revu
  • Excel
  • Outlook
Walk all ten stages

Other trades

Run one of your own mechanical pursuits through it.

Book a live demo