[ Plumbing ]

Plumbing estimating software. Medical gas, site utilities, the bid after.

Fixture counts are the easy part. The bid moves on medical gas, site utility boundaries, and insulation nobody claimed.

Specification
Division 22
Sheets
P-series
Gate
You press send

Plumbing scope ends where civil begins, and the line moves from job to job. Certification requirements and specialty systems sit in specification sections the fixture schedule never references.

The whole package, opened out.

Every document that governs a plumbing bid, and the ones that hide something.

  1. 00 21 13Instructions to bidders
  2. 01 11 00Summary of workMandatory site visit
  3. 22 07 00Plumbing insulationCounted twice
  4. 22 11 00Water distributionScope boundary
  5. 22 62 00Medical gas systemsCertification
  6. P-101Floor plans
  7. P-601Fixture scheduleTrim package
  8. C-201Site utilitiesScope boundary
  9. ADD-01Addendum 1

9 documents in this plumbing package. 6 of them carry something that changes the number, and only one of those is a drawing.

Read the document, not the summary.

One extract from the plumbing documents, at the scale an estimator reads it.

Where building scope endsC-201 / 22 11 00
BUILDINGUNCLAIMEDPROPERTY LINE · SPEC 22 11 00 §1.25′-0″ FROM BUILDING · DWG C-201
Trench, pipe, and backfill live in the gap.The line moves job to job. Both documents were issued together and neither one is wrong on its own terms.
Division 22 · P-series

What it catches in plumbing.

Each one cited to the document and page that proves it, so an estimator can verify it, price it, and approve the move.

Illustrative of the conditions this trade bids. Named pursuits, companies, and prices across this site are fictional.

Sector changes the clauses.

The same trade prices very differently depending on what is being built.

How ArosBid runs it.

ArosBid reads every specification section that touches your scope, not just the ones in the invitation email, and cites the page that proves each one.

ArosBid includes takeoff and estimate and replaces Trimble AutoBid. Then it runs the bid process after those quantities exist.

Vendor packages go out from construction vendor RFQ. Quotes come back to vendor quote leveling. Later changes sit on the construction bid addendum log. MEP estimating as a hub is MEP estimating software. Plumbing estimating as its own search is plumbing estimating software.

Alongside
  • FastEST
  • Bluebeam Revu
  • Excel
  • Outlook
Walk all ten stages

Other trades

Run one of your own plumbing pursuits through it.

Book a live demo