[ Roofing ]

Roofing estimating software. NDL warranty, uplift, and tear-off.

The warranty is the product. Uplift rating, tapered R-value, and tear-off assumptions decide whether the number holds.

Specification
Division 07
Sheets
A-series roof
Gate
You press send

A roofing bid is a warranty bid. Manufacturer terms, uplift classification, and the condition of what is already up there each move the price more than square footage does.

The whole package, opened out.

Every document that governs a roofing bid, and the ones that hide something.

  1. 00 21 13Instructions to bidders
  2. 01 11 00Summary of workMandatory site visit
  3. 02 41 19Selective demolitionTear-off assumed
  4. 07 22 00Roof insulationR-value basis
  5. 07 54 00Thermoplastic membraneWarranty term
  6. A-701Roof planR-value basis
  7. A-702Roof details
  8. S-201Roof framing
  9. ADD-03Addendum 3

9 documents in this roofing package. 5 of them carry something that changes the number, and only one of those is a drawing.

Read the document, not the summary.

One extract from the roofing documents, at the scale an estimator reads it.

Roof assembly · section at drainA-701 / 07 54 00
DRAINMembrane, 60 milCover boardTapered insulationVapour retarderSteel deck
DrawingsAverage R-30across the field
SpecificationMinimum R-30at the drain
The thinnest point sets the package.A tapered system that averages R-30 is a different quantity of insulation from one that never drops below it. The warranty quoted at fifteen years against a twenty-year requirement is priced by the manufacturer, not the installer.
Division 07 · A-series roof

What it catches in roofing.

Each one cited to the document and page that proves it, so an estimator can verify it, price it, and approve the move.

Illustrative of the conditions this trade bids. Named pursuits, companies, and prices across this site are fictional.

Sector changes the clauses.

The same trade prices very differently depending on what is being built.

How ArosBid runs it.

ArosBid reads the pre-bid minutes and every addendum alongside the specification, so an assumption made at the walkthrough is checked against the document that governs it.

ArosBid includes takeoff and estimate and replaces Trimble AutoBid. Then it runs the bid process after those quantities exist.

Vendor packages go out from construction vendor RFQ. Quotes come back to vendor quote leveling. Later changes sit on the construction bid addendum log. Roofing estimating as its own search is roofing estimating software.

Alongside
  • STACK
  • Bluebeam Revu
  • Excel
  • Outlook
Walk all ten stages

Other trades

Run one of your own roofing pursuits through it.

Book a live demo