Electrical estimating software for gear, feeders, and the bid after.

Gear lead times, the low-voltage boundary, and a one-line that does not match the feeder schedule.

Specification
Division 26
Sheets
E-series
Gate
You press send

The number is set by distribution equipment you cannot get quickly and by scope that lives on the seam between Division 26, 27, and 28. Both risks are readable in the documents before the bid goes out.

The whole package, opened out.

Every document that governs a electrical bid, and the ones that hide something.

  1. 00 21 13Instructions to bidders
  2. 01 11 00Summary of workMandatory site visit
  3. 01 51 00Temporary utilitiesTemp power assigned
  4. 26 05 00Common electrical requirementsDiv 27 / 28 by others
  5. 26 24 13Switchboards and panelboardsLead time
  6. E-101One-line diagramFeeder conflict
  7. E-501Panel schedulesFeeder conflict
  8. E-601Details
  9. ADD-02Addendum 2

9 documents in this electrical package. 6 of them carry something that changes the number, and only one of those is a drawing.

Read the document, not the summary.

One extract from the electrical documents, at the scale an estimator reads it.

Quoted delivery against the scheduleE-101 / 26 24 13
  • Switchgear42 wks
  • Dry-type transformers22 wks
  • Panelboards18 wks
Twelve weeks past the milestone it feeds.Escalation and liquidated damages both belong to whoever failed to read the delivery date against the schedule.
Division 26 · E-series

What it catches in electrical.

Each one cited to the document and page that proves it, so an estimator can verify it, price it, and approve the move.

Illustrative of the conditions this trade bids. Named pursuits, companies, and prices across this site are fictional.

Sector changes the clauses.

The same trade prices very differently depending on what is being built.

How ArosBid runs it.

Gear quotes arrive late and expire fast. ArosBid tracks every RFQ, chases the trades still missing coverage, and reconciles each quote against the schedule it has to hit.

ArosBid includes takeoff and estimate and replaces Trimble AutoBid. Then it runs the bid process after those quantities exist.

Vendor packages go out from construction vendor RFQ. Quotes come back to vendor quote leveling. Later changes sit on the construction bid addendum log. MEP estimating as a hub is MEP estimating software. Electrical estimating as its own search is electrical estimating software.

Alongside
  • Accubid-class takeoff
  • Bluebeam Revu
  • Excel
  • Outlook
Walk all ten stages