[ Pricing ]
Every deployment is its own isolated instance on your infrastructure, with your identity provider and your bid sources, so the amount is quoted rather than listed. Everything else on this page is specific.
Every document and addendum read and cited before anyone starts pricing. It never drafts.
The whole cycle drafted end to end, stopping at a person before anything leaves the office.
Keeps running after you submit, so buyout, debrief and history feed the next number.
Nineteen lines, not a spreadsheet. The last group is identical on every plan, which is the point.
| What it covers | One Desk | The Department | The Whole Year |
|---|---|---|---|
| Reading the set | |||
| Intake from Outlook and connected bid sources | Included | Included | Included |
| Every document and addendum read, cited to page | Included | Included | Included |
| Bid / No-Bid scored against your own history | Not included | Included | Included |
| Pricing the job | |||
| Cited equipment BOM with installed labour hours | Not included | Included | Included |
| Vendor RFQ packages and automatic follow-ups | Not included | Included | Included |
| Quote leveling and total reconciliation | Not included | Included | Included |
| Approved values mapped into the Excel workbook | Not included | Included | Included |
| Submission | |||
| Proposal assembled: scope, clarifications, exclusions | Not included | Included | Included |
| Readiness check on bonding, addenda and alternates | Not included | Included | Included |
| After award | |||
| Buyout drafts, purchase orders and bonds | Not included | Not included | Included |
| Turnover package | Not included | Not included | Included |
| Loss debrief and bid-to-win gap | Not included | Not included | Included |
| Cost library, GC scorecard, vendor history | Not included | Not included | Included |
| Deployment | |||
| Isolated instance, your own subdomain and database | Included | Included | Included |
| Your branding throughout the product | Included | Included | Included |
| Microsoft Entra ID single sign-on | Included | Included | Included |
| ControlIdentical on every plan | |||
| Recorded approval during training | Included | Included | Included |
| Money computed as deterministic integer cents | Included | Included | Included |
| The agent never holds a credential | Included | Included | Included |
| Every allowed and denied request written to the audit log | Included | Included | Included |
Six steps from the scoping call to a real bid running through the cycle. What we need from you is named at every one.
Confirm the plan, which bid sources to connect, and which Entra ID tenant signs in.
From youWhoever owns estimating, and someone from IT.
Your isolated deployment, database and document store on your own subdomain, branded as your company.
From youYour subdomain preference and brand assets.
Microsoft Entra ID single sign-on, so your estimators use the credentials they already have.
From youA tenant admin for one approval.
Outlook, OneDrive and Excel natively; the bid sources on your plan connected and tested.
From youMailbox access and bid-source logins.
Closed pursuits imported so the cost library and scorecards have something to reason from.
From youAn export of past bids, in whatever shape it exists.
You run a real bid through the cycle alongside your current process and compare the two.
From youOne live pursuit, and an estimator to approve the sends.
Timing depends on your IT approvals and how much bid history you load. It is confirmed on the scoping call, not promised here.
Four questions on the first call. None of them is a feature you have to buy back.
How many people work a pursuit, and how many need to approve a send.
Volume sets the document load, not the feature list.
Which of BuildingConnected, Dodge, PlanHub, ConstructConnect and SmartBid feed your intake.
Where the isolated instance lives and which Entra ID tenant signs in.
Stated the way your own proposals state them, so nothing arrives as a surprise at buyout.
ArosBid includes takeoff and estimate and replaces Trimble AutoBid. STACK, McCormick, and FastEST are other takeoff tools in the market.
During training, nothing leaves without a recorded human approval. It then automates what you already approved. L5 Autonomous is next.
No plan prices a job by model. Every extension and reconciliation is code.
Your deployment is isolated. Your documents stay in your store.
Every deployment is its own instance, on your infrastructure boundary, with your identity provider and your connected bid sources. A published seat price would be a number we would have to re-quote on the first call anyway. Ask and you get a real one.
The six steps below are the whole sequence. Timing depends on how quickly your IT team can approve the tenant connection and how much bid history you want loaded, so it is confirmed on the scoping call rather than promised here.
Yes. The three are rungs on the same ladder. Moving up grants more of the cycle to draft. During training, sends still cite a recorded approval; then ArosBid automates what you already signed off.
The last rollout step is a live pursuit run alongside your current process, so you compare the two on your own job before committing further.
It is your database and your document store in your own deployment. Export is not a feature we gate.
Your team, through your Microsoft Entra ID tenant. ArosBid does not hold a separate password for your estimators.
Bring a live tender to the call. We run it through the cycle in front of you, on an instance branded as your company.
Book a live demo