documents and addenda in a single pursuit
The date that disqualifies the bid can be buried anywhere in the set.
Every send, approved.
SCROLL Open the bid command center
…and every trade that bids.
Mechanical
Electrical
Plumbing
Roofing
Steel[ Why teams switch ]
A manual bid process splits the week across an inbox, a takeoff seat, a shared drive, and a workbook. The quantities can be careful and the submission can still be wrong, because the miss was a clause, a late addendum, or a vendor total that did not match its own lines.
Trade contractors switch when that work has to happen before close, not after buyout. Tender review has to cite the page. Leveling has to recompute the number. A send has to wait for a person. Those are the hours around the estimate, and they are where bids break.
ArosBid keeps takeoff and estimate on the same desk as that review. Scope gaps are flagged while the set is still open. Every extension is integer-cent code. During training, nothing leaves without a recorded approval.
[ Bid day, as it actually happens ]
The date that disqualifies the bid can be buried anywhere in the set.
Leveling turns into a sprint while the submission clock keeps moving.
A missed exclusion, warranty gap, or bad total walks straight into buyout.
[ What it catches ]
Each catch is tied to the document and page that proves it—so the estimator can verify it, price it, and approve the move.
Spec 01 11 00 §1.8 · page 3
Absent from the invitation email. Non-attendance disqualifies the bid.
Chiller schedule · drawing M-401
Spec calls for 350 tons. The drawing schedule calls for 400. RFI drafted before pricing.
Vendor quote · fine print
Startup labor excluded. One-year warranty offered against a two-year requirement.
Vendor quote · total check
The stated grand total and the sum of its line items differ by half a million dollars.
From the Riverside Office Tower demo scenario. Names, companies, and prices are fictional.
[ How a bid runs ]
01Recognizes the ITB and creates the pursuit workspace.
Human gate · Read-only
02Drafts the close calendar and project structure.
Human gate · Calendar invite
03Finds dates, risks, conflicts, LDs, and alternates.
Human gate · Invites + RFIs
04Scores the pursuit against GC history and past bids.
Human gate · Decision
05Builds a cited BOM with installed labor hours.
Human gate · BOM
06Drafts trade packages and follow-up reminders.
Human gate · Every send
07Normalizes quotes and reconciles every total.
Human gate · Award rec.
08Maps approved values into the Excel workbook.
Human gate · Export
09Assembles scope, clarifications, and exclusions.
Human gate · Package
10Confirms bonding, addenda, alternates, and gates.
Human gate · You submitControl is architecture
This is how an estimating team lets AI near the bid without giving it authority it should never have.
The mail connector refuses to release anything unless the request cites a recorded, approved decision.
Every extension, sum, reconciliation, and allowance uses deterministic integer-cent calculations.
Capability-scoped connectors hold credentials, enforce access, and write every allowed or denied request to the audit log.
[ After the bid goes out ]
Buyout, bonds, turnover, and debrief run in the same workspace that priced the job—so nothing is re-keyed and every loss teaches the next bid.
[ The portfolio brain ]
Closed pursuits feed the cost library, bid-to-win gap, GC scorecards, and vendor history—turning bid history into the context for the next decision.
Across comparable mechanical pursuits
Trades need one more quote
Closed bids updating the library
Per-GC history from every closed pursuit
[ Autonomy ladder ]
During training, nothing leaves without a recorded human approval. After that, it runs what you already signed off. L5 Autonomous is next.
Runs all ten stages. During training, every send cites a recorded approval.
Connected construction stack
Move tender intake, documents, approved numbers, and project handoff through the tools your team already knows. Takeoff and estimate are in ArosBid.

[ Deployment & ownership ]
01Your own isolated deployment and subdomain
02Your own database and document store
03Your branding throughout the product
04Your Microsoft Entra ID SSO
“On your data, owned by your team.”— Arosplatforms
[ Desk pages ]
Crawlable desks for the searches that should land on a trade estimator, not a bid board.
[ Questions ]
In your own isolated deployment, with your own database and document store, on your own subdomain. Your team signs in with your Microsoft Entra ID.
ArosBid includes takeoff and estimate and replaces Trimble AutoBid. STACK, McCormick, and FastEST are other takeoff tools in the market.
During training, nothing leaves without a recorded human approval. It learns those decisions, then automates what you already signed off. L5 Autonomous is next.
Money is code, not a model. Every extension, sum, reconciliation, and allowance uses deterministic integer-cent calculations.
Outlook, OneDrive, and Excel natively. Bid sources like BuildingConnected, Dodge, PlanHub, and ConstructConnect connect.
Book a live walkthrough of the full cycle, intake to submission. Your demo instance is branded as your company before the call starts.
See ArosBid live
A live walkthrough of the full cycle—intake, document review, leveling, proposal, and submission—with a human gate on every send.
Book a live demo Your demo instance is branded as your company before the call starts.